    December 20

    20/12/2007 B47 Written Reminder

    1) Material inspection form 欠 certificate of origin ( Cable lug & Cable Gland)
     
    2) External fence wall inspection form 欠 approval shop drawing no. (BCI/EE/UG/002D)
     
    3) G/F Trunking and Cable Tray layout 要 update level 供做槽準備
     
    4) External check cable duct
     
    5) G/F - 2/F Concealed conduit update conduit layer 供穿線準備
     
    6) External footbridge lift switchroom 欠 earthing terminal. 出order
     
    7) External footbridge lift switchroom 欠 rod to tape clip, dquare tape clamp and DC tape clamp. 出order
     
    8) Bonding detail drawing submission
     
    9) High mast cable changing box detail
     
     
    August 27

    2007-08-27 SITE NOTES

    1.  Emergency call bell system must to provide 1/F toilet and all disable toilet.
    2.  Emergency call bell system must to provide G/F weight lifting room 1 & 2.
    3.  2/F Photo finish control room = 2/F Record keeper's  room. Revise the main schematic,  
         add the MCB board provided by essential power, all electrical circuits are provided by the MCB board except UPS lighting.
         Revise the concealed conduit drawing.
    4.  4 nos of 100A TPN S/W power in G/F interview room are provided by G/F switch room 2 MCCB Board.
         95mm sq. armored cable 160A MCB board.
    5.  10 nos of 100A TPN S/W power in G/F media room are provided by G/F main switch room 2 L.V. switchboard spare position.
         300mm sq.  armored cable 200A MCCB board.
    6.  M/F water heater room 2 & 3 100A TPN S/W change to 100A MCCB board.